GPS · Grade control
Site grading
Rough grade through finish grade held to the elevations on the plan, with subgrade proofrolled and shaped so the next trade starts on something square.

Scope included
What this scope covers.
- Rough grading and subgrade preparation
- Finish grade to plan elevations
- Parking lot and drive subgrade
- Swale, berm and drainage shaping
- Pad preparation ahead of stone base
- As-built grade verification
- Control
- Machine grade control checked against the plan's spot elevations and benchmarks
- Subgrade
- Proofrolled before stone; soft areas reported before they are covered
- Balance
- Cut and fill equalized on site before import is priced
- Deliverable
- Grade turned over ready for stone, concrete or building
• Field standard
We don't miss grade.
It is the one line on the company's own bid that never moves. Grade is checked against the plan, not against the last pass — and anything that will not hold is reported before it gets buried under stone.
Questions
Site grading — FAQ
Do you use GPS machine control?
Yes. Grade is run under machine control and verified against the spot elevations and benchmarks on the civil set.
Can you grade a parking lot subgrade without placing the asphalt?
Yes, and that is the normal arrangement. BD Excavation carries earthwork, subgrade and stone base; the paving contractor places the asphalt.
What happens if the subgrade fails a proofroll?
Work stops on that area, the Contractor is notified, and the repair is quoted and executed as a written change order before it proceeds. Nothing soft gets covered up quietly.
Related scope
Other work on the same set.
Commercial excavation
Topsoil strip, cut/fill, building pads, footing excavation, clearing and demolition.
Underground utilities
Coordinated trenching, bedding, installation support, backfill and site restoration.
Storm sewer and drainage
Storm mains, structures, detention, subdrain, downspout drains and drainage shaping.
Bid desk · plans + addenda